Forum Index  ViceVersa HOME         FAQ and Knowledge Base

 FAQForum FAQ   SearchSearch Forum  RegisterRegister 
 ProfileProfile   Log inLog in 

Scheduling multiple concurrent jobs

 
Post new topic   Reply to topic     Forum Index -> Support
Author Message
Jasen
Guest





PostPosted: Mon Apr 10, 2006 4:03 pm    Post subject: Scheduling multiple concurrent jobs Reply with quote

I am using Vice Versa on our server to back up users files to the server nightly.

I have set up each user with their own backup profile and scheduled them to run at a set time each night. I set them up with thier own profile so that I can get individual error reports and see at a glace on the vvscheduler who succeeded and who failed.

The problem I'm having is that it seems that I can only run eight concurrently. Any more that try to run at the same time will fail and not run and not write an error report at all.

If I use the /wait command then it will only run one at a time. This won't work for us as the backup process will take entirely too long. Is there a way to get it to run more than 8 at a time or to use the /wait in order to wait for an open thread and be able to continue to run 8 at a time?
Back to top
TGRMN Software
Site Admin


Joined: 10 Jan 2005
Posts: 8769

PostPosted: Tue Apr 11, 2006 1:28 am    Post subject: Reply with quote

You should be ablt to run more than 8 at the same time. What type of error do you get?
_________________
--
TGRMN Software Support
http://www.tgrmn.com
http://www.compareandmerge.com
Back to top
Display posts from previous:   
Post new topic   Reply to topic     Forum Index -> Support All times are GMT
Page 1 of 1

 
Jump to:  
You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © phpBB Group
Copyright © TGRMN Software. TGRMN Software products: