Author |
Message |
Ghost Writer
Joined: 14 Mar 2015 Posts: 2
|
Posted: Sat Mar 14, 2015 2:15 pm Post subject: Sync variable |
|
|
I would like to set up VVpro to sync data folders between Raid / non-Raid drives on file change, but delay the sync process when certain resource heavy programs, Adobe Premiere for example, are in use.
Looking through the info I was not able to find instructions on doing that. If someone could point me in the right direction I'd be grateful. |
|
Back to top |
|
|
TGRMN Software Site Admin
Joined: 10 Jan 2005 Posts: 8763
|
Posted: Tue Mar 17, 2015 11:44 pm Post subject: |
|
|
Hi, in VVEngine a delay can be applied. The option is in the VVEngine settings, see VVEngine help, an extract below:
<<
After First File Change is Detected...
This option defines the VVEngine behavior when file changes are detected.
You can set the amount of seconds of inactivity to wait, after the first file change is detected, before VVEngine starts a profile. You can also set the total maximum time to wait in seconds.
For example, the default values are 3 and 10, which means that VVEngine will look for a period of inactivity of 3 seconds before starting a profile, after the first file change is detected, but limited to a total maximum of 10 seconds. If after 10 seconds, there is no period of inactivity of 3 seconds, VVEngine will start the profile anyway.
>> _________________ --
TGRMN Software Support
http://www.tgrmn.com
http://www.compareandmerge.com |
|
Back to top |
|
|
Ghost Writer
Joined: 14 Mar 2015 Posts: 2
|
Posted: Wed Mar 18, 2015 10:39 pm Post subject: |
|
|
Thanks for getting back to me
In addition to what you posted I found this
- start only if a file exists or a particular process is not running, etc -
So I should be good on getting the scheduling engine. |
|
Back to top |
|
|
TGRMN Software Site Admin
Joined: 10 Jan 2005 Posts: 8763
|
Posted: Thu Mar 19, 2015 4:46 am Post subject: |
|
|
Yes, you can prevent a profile from running if a specific process is also running, the option is in the VVEngine scheduling settings. _________________ --
TGRMN Software Support
http://www.tgrmn.com
http://www.compareandmerge.com |
|
Back to top |
|
|
|
|
You can post new topics in this forum You can reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum
|
Powered by phpBB © phpBB Group
|