Forum Index  ViceVersa HOME         FAQ and Knowledge Base

 FAQForum FAQ   SearchSearch Forum  RegisterRegister 
 ProfileProfile   Log inLog in 

Sync variable

 
Post new topic   Reply to topic     Forum Index -> Support
Author Message
Ghost Writer



Joined: 14 Mar 2015
Posts: 2

PostPosted: Sat Mar 14, 2015 2:15 pm    Post subject: Sync variable Reply with quote

I would like to set up VVpro to sync data folders between Raid / non-Raid drives on file change, but delay the sync process when certain resource heavy programs, Adobe Premiere for example, are in use.

Looking through the info I was not able to find instructions on doing that. If someone could point me in the right direction I'd be grateful.
Back to top
TGRMN Software
Site Admin


Joined: 10 Jan 2005
Posts: 8763

PostPosted: Tue Mar 17, 2015 11:44 pm    Post subject: Reply with quote

Hi, in VVEngine a delay can be applied. The option is in the VVEngine settings, see VVEngine help, an extract below:

<<
After First File Change is Detected...

This option defines the VVEngine behavior when file changes are detected.

You can set the amount of seconds of inactivity to wait, after the first file change is detected, before VVEngine starts a profile. You can also set the total maximum time to wait in seconds.

For example, the default values are 3 and 10, which means that VVEngine will look for a period of inactivity of 3 seconds before starting a profile, after the first file change is detected, but limited to a total maximum of 10 seconds. If after 10 seconds, there is no period of inactivity of 3 seconds, VVEngine will start the profile anyway.
>>
_________________
--
TGRMN Software Support
http://www.tgrmn.com
http://www.compareandmerge.com
Back to top
Ghost Writer



Joined: 14 Mar 2015
Posts: 2

PostPosted: Wed Mar 18, 2015 10:39 pm    Post subject: Reply with quote

Thanks for getting back to me

In addition to what you posted I found this

- start only if a file exists or a particular process is not running, etc -

So I should be good on getting the scheduling engine.
Back to top
TGRMN Software
Site Admin


Joined: 10 Jan 2005
Posts: 8763

PostPosted: Thu Mar 19, 2015 4:46 am    Post subject: Reply with quote

Yes, you can prevent a profile from running if a specific process is also running, the option is in the VVEngine scheduling settings.
_________________
--
TGRMN Software Support
http://www.tgrmn.com
http://www.compareandmerge.com
Back to top
Display posts from previous:   
Post new topic   Reply to topic     Forum Index -> Support All times are GMT
Page 1 of 1

 
Jump to:  
You can post new topics in this forum
You can reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum


Powered by phpBB © phpBB Group
Copyright © TGRMN Software. TGRMN Software products: