Author |
Message |
timc
Joined: 04 Jul 2012 Posts: 2
|
Posted: Wed Jul 04, 2012 4:49 am Post subject: Preventing partial synchronisation |
|
|
How can I prevent partial synchronisations?
I have a backup configured to use CRC comparison. I had thought it was running fine as it was being reported as successful (in VVEngine and by email). However, looking at the logs reveals many instances of "File will be excluded from comparison/execution" errors. In some cases as little as 5% of the files in the backup are actually being copied.
The nature of this backup set is such that I need either everything to be synchronised or for the backup to be reported as unsuccessful. How can I accomplish this?
Also, there does not appear to be any way to configure retries within a synchronisation. Sure, I can configure the scheduler to retry the job later but that is a pretty heavy-handed way of handling intermittent network problems. |
|
Back to top |
|
|
TGRMN Software Site Admin
Joined: 10 Jan 2005 Posts: 8763
|
|
Back to top |
|
|
timc
Joined: 04 Jul 2012 Posts: 2
|
Posted: Thu Jul 05, 2012 1:20 am Post subject: |
|
|
TGRMN Software wrote: | Hello,
"File will be excluded from comparison/execution" is reported if the file can't be accessed during comparison for CRC calculation. Maybe the best option is to enable VSS if possible: http://www.tgrmn.com/web/kb/item33.htm
thanks |
I am performing backups from a machine connected to the network via VPN. It is my understanding that VSS is not applicable in this situation. |
|
Back to top |
|
|
TGRMN Software Site Admin
Joined: 10 Jan 2005 Posts: 8763
|
Posted: Wed Jul 11, 2012 11:34 pm Post subject: |
|
|
No, you are right, the problem is that ViceVersa needs to open and read the file for CRC calculation and if the file(s) is in use and exclusively locked, ViceVersa won't be able to calculate the CRC. thanks _________________ --
TGRMN Software Support
http://www.tgrmn.com
http://www.compareandmerge.com |
|
Back to top |
|
|
|